The Checkmate example is a real grant draft scored 74 out of 100 against six criteria, with the four specific gaps that cost it the other 26 points.
Anonymised: the organisation, city, address and amount are changed; the structure, the wording and the scores are from the original run. It lost points for a missing budget table, unevidenced need, absent partner letters and no evaluation framework.
The document has all ten sections and reads well. Compliance scored 90 because nothing was missing or mislabelled. It lost points where a reviewer would have pushed back, not where a reader would wince.
The budget narrative named five cost categories \u2014 renovation, equipment, salaries, project management, contingency \u2014 and gave no figure for any of them. A reviewer cannot check a six-figure request against categories alone, and most funders require the table.
Fix: give each category an amount and a total that ties to the request.
The need was stated, not evidenced: \u201cthe structures are in a reparable condition and require extensive renovation\u201d with no inspection report, no violation count, no local statistic. That sentence is true of thousands of buildings.
Fix: attach the inspection date and findings, or a count of failed safety items.
The plan names schools and local agencies as partners in delivery, but nothing in the packet shows they have agreed. A named partner with no letter is a promise the funder cannot rely on.
Fix: one short letter per named partner, even an email confirming intent.
Outcomes were measurable (\u201c95% school enrollment\u201d, \u201cimproved health indicators\u201d) but the method was not: no baseline, no target per period, no named data source, no one responsible for collecting it.
Fix: for each outcome, state baseline, target, source and who collects it.
A score in the nineties tells you nothing about whether the tool works. This letter is competent \u2014 every section, a clear ask, a real sustainability plan \u2014 and it would still have gone to a reviewer without a budget table, without evidence for its central claim, without partner letters, and without a way to measure its own outcomes. That is the failure mode scoring is for: not bad writing, unpreventable rejections.
It is not a funder's decision. Checkmate applies a fixed rubric to the document, and a funder weighs strategy, local priorities and politics that no rubric sees. Read their guidelines first.